Feldkirch Regional Hospital South Central Wing Vertical Extension

Construction Management (Site Supervision)
Structural engineering
Concrete construction
Steel construction
Construction management
Cost planning
Scheduling
Contract Award

Master Plan 2012: Feldkirch Regional Hospital, Phase 3 – Addition of a second story to the south wing. Originally a single-story structure, now two stories. Renovation of outpatient clinics; addition of an east ventilation center. Utilization of the existing structural framework with "Vierendeel" girders. Holistic facade design: open long sides, aluminum windows, natural stone cladding. Perforated stone slabs for a pleasant lighting atmosphere in the stairwell. Construction costs ~ 18.5 million, ~ 2,200 m² of usable floor space, lightweight construction with steel structure ~ 96 tons. Exposed concrete stairwell inside. 18 outpatient clinics with associated ancillary rooms such as waste disposal, supply, base, lounge, meeting room, storage, and technical facilities. 20 offices, which have now been converted into 10 outpatient clinics.

Client: Vlbg. Krankenhausbetriebsgesellschaft mbH

Client: Vlbg. Krankenhausbetriebsgesellschaft mbH

Architecture: Marte.Marte Architekten ZT GmbH, Austria

Type: public building

Property location: Feldkirch, Vorarlberg, Austria

Project period: 2021–2024

LKHFMittel1.jpeg
LKHFMittel2.JPG
LKHFMittel3.JPG
LKHFMittel4.JPG
LKHFMittel5.jpeg
LKHFMittel6.jpeg
LKHFMittel1.jpeg
LKHFMittel2.JPG
LKHFMittel3.JPG
LKHFMittel4.JPG
LKHFMittel5.jpeg
LKHFMittel6.jpeg
Back to the project overview