Essentially, the school campus consists of three building sections: on the north side, adjacent to Fischerbühel, there is a three-story new building (partly basement, ground floor, first floor) with an entrance area, auditorium, dining hall, commercial kitchen, parent counseling office, and all-day care facilities on the ground floor. Above this are the kindergarten and the administrative area; in the basement is the double gymnasium, with changing rooms and ancillary spaces.
To the south of this are the two classroom wings from the 1960s, designed by the C4 architectural consortium, which are conceptually complemented by open learning zones and circulation areas.
The building housing the SPZ, constructed in the 1990s, adjoins the classroom wings to the south. Together, the three buildings enclose an inner courtyard and, together with the school arena at the center, form a semi-enclosed courtyard. The SPZ building will not be renovated and will be preserved in accordance with the consensus.

 

Client: Municipality of Lustenau

Architecture: fasch&fuchs.ZT-gmbh

Type: public building

Property location: Lustenau, Austria

Gross floor area: 43,000 m²
Gross floor space: 9,400 m²
Investment volume: approximately 46 million euros

© Text and renderings by fasch & fuchs.architekten

Project period: 2021–2025

Lustenau-P2.jpg
Lustenau-P1.jpg
46194-Campus RK Construction Site Jan. 1, 2022_Lukas Hämmerle Thomas Holzer (7).jpg
49502-photo6_CampusRK_Construction_Site_Tour_01062022_Lukas Hämmerle (45).jpg
Site Plan.jpg
Rendering.jpg
Lustenau-P2.jpg
Lustenau-P1.jpg
46194-Campus RK Construction Site Jan. 1, 2022_Lukas Hämmerle Thomas Holzer (7).jpg
49502-photo6_CampusRK_Construction_Site_Tour_01062022_Lukas Hämmerle (45).jpg
Site Plan.jpg
Rendering.jpg
Back to the project overview