ÖBBRosenbach Power Plant: Inspection report for a power plant, including shaft vibration measurements:
An inspection report of the power plant facility was prepared for the purpose of preserving evidence. To identify any damage caused by the work on the second tube of the Karawanken Tunnel at the Rosenbach power plant, a comprehensive inspection report was prepared for the Francis turbines.
Major works:
- Shaft vibration measurements
- Blade Thickness Measurement (Ultrasonic)
- Assessment of cavitation and erosion damage
Net head: 67.58 m
Design flow: 1.8 m³
Turbine capacity per unit: 550 kW
Rated speed: 1000 rpm
Number of turbine units: 2