Schütt Power Plant

FEM analysis
Calculations and multi-body simulations
Structural engineering
Mechanical engineering
Consulting, tendering, and technical construction management
Technical and economic analyses
Risk assessments and CE markings
Technical inspections

Finite element analysis of the fish lift and preparation of the complete operational documentation for the facility. Operationally critical documents have been prepared for this facility, ranging from FEM calculations and risk analysis to the validation of safety control systems and the operation and maintenance manual.

Major works:

  • Finite Element Method Calculation
  • Risk Analysis
  • Validation of safety control systems
  • Operating and Maintenance Manual
  • CE Declaration of Conformity

Client: KELAG AG

Client: Hydro-Connect GmbH

Type: Commercial construction, plant construction, special-purpose construction

Property location: Arnoldstein, AT

Head: 6.5 m
Operating speed: 3–8 rpm
Nominal pipe diameter: 1.4 m
Number of machine sets: 1

Project period: 2018

www-20191202--gbd_1805-KELAG-KW-Schütt-Image-1.jpg
www-20191202--gbd_1805-KELAG-KW-Schütt-Image-2.jpg
www-20191202-gbd_1805-KELAG-KW-Schütt-Image-3.jpg
www-20191202--gbd_1805-KELAG-KW-Schütt-Image-1.jpg
www-20191202--gbd_1805-KELAG-KW-Schütt-Image-2.jpg
www-20191202-gbd_1805-KELAG-KW-Schütt-Image-3.jpg
Back to the project overview