Hohenstein Power Plant
Bidding, consulting, and ongoing monitoring
Quality assurance and commissioning of the new distribution pipeline, the two suction lines, and the two pressure relief lines.
The project included:
- Component inspections at the manufacturer's facility
- Inspection of installation work (construction site joints, etc.)
- Conducting essential commissioning tests (emergency shutdown tests, leak tests on the distribution piping, etc.)
- Final Acceptance - Documentation of Quality Assurance and Monitoring