Mestiachala I&II Hydropower
Calculations and Multibody Simulations
Mechanical engineering
Consulting, tendering, and technical project management
Technical and economic analyses
Risk assessments and CE markings
Technical inspections
Mechanical engineering
Consulting, tendering, and technical project management
Technical and economic analyses
Risk assessments and CE markings
Technical inspections
Quality control throughout the construction of all steel hydraulic structures and electromechanical systems.Although theMestiachala I & II hydropower plants are high-pressure facilities, they are run-of-river power plants. With a capacity of 50 MW, this is one of the largest projects in Georgia.
Major works:
- Concomitant quality control: VT, MT, PT, UT
- Commissioning
- Validation of safety control systems
- Defect Tracking
HeightHead: ~200 m
Nominal pipe diameter: 1.8 m – 2.4 m
Peak capacity: 20 MW + 30 MW
Number of turbine sets: 5