Mestiachala I&II Hydropower

Calculations and Multibody Simulations
Mechanical engineering
Consulting, tendering, and technical project management
Technical and economic analyses
Risk assessments and CE markings
Technical inspections

Quality control throughout the construction of all steel hydraulic structures and electromechanical systems.Although theMestiachala I & II hydropower plants are high-pressure facilities, they are run-of-river power plants. With a capacity of 50 MW, this is one of the largest projects in Georgia.

Major works:

  • Concomitant quality control: VT, MT, PT, UT
  • Commissioning
  • Validation of safety control systems
  • Defect Tracking

Client: ILF Consulting Engineers Austria GmbH

Type: Commercial construction, plant construction, special-purpose construction

Property location: Mestiachala, Georgia

HeightHead: ~200 m
Nominal pipe diameter: 1.8 m – 2.4 m
Peak capacity: 20 MW + 30 MW
Number of turbine sets: 5

Project period: 2018–2019

20191202--gbd_1804-KW-Mestiachala-I-&-II-Georgia-Image2.jpg
quer-20191202--gbd_1804-KW-Mestiachala-I-&-II-Georgia-Image1.jpg
www-20191202--gbd_1804-KW-Mestiachala-I-&-II-Georgia-Image1.jpg
20191202--gbd_1804-KW-Mestiachala-I-&-II-Georgia-Image2.jpg
quer-20191202--gbd_1804-KW-Mestiachala-I-&-II-Georgia-Image1.jpg
www-20191202--gbd_1804-KW-Mestiachala-I-&-II-Georgia-Image1.jpg
Back to the project overview