Mons Solar Sennwald

Structural Engineering
Concrete construction
Steel construction

Mons Solar AG is building a new headquarters in Sennwald. During the first phase of construction (2022–2023), the lower three floors will be built to provide space for a warehouse and approximately 200 employee workstations. In the second phase of construction (beginning in 2024), three additional floors will be added, and the building is expected to accommodate up to 400 employees.

Technical Details:
_ Column-free area in the inner courtyard (16x24m) for flexibility on the ground floor
_ Two 32m-long cast-in-place concrete beams to control floor deflection
_ Floor slab: Floating, thermally active, poured last
_ Columns on individual pile foundations

Client: Mons Solar AG

Client: Mons Solar AG

Type: Commercial building

Property location: Sennwald, Switzerland

Project period: 2022–2024

IMG_9025-min.JPG
IMG_0447-min.JPG
IMG_0586-min.JPG
IMG_0605-min.JPG
IMG_0446-min.JPG
IMG_0582-min.JPG
IMG_0591-min.JPG
IMG_0592-min.JPG
IMG_0604-min.JPG
IMG_0848-min.JPG
IMG_0840-min.JPG
IMG_8895-min.JPG
IMG_9020-min.JPG
IMG_9538-min.JPG
IMG_9025-min.JPG
IMG_0447-min.JPG
IMG_0586-min.JPG
IMG_0605-min.JPG
IMG_0446-min.JPG
IMG_0582-min.JPG
IMG_0591-min.JPG
IMG_0592-min.JPG
IMG_0604-min.JPG
IMG_0848-min.JPG
IMG_0840-min.JPG
IMG_8895-min.JPG
IMG_9020-min.JPG
IMG_9538-min.JPG
Back to the project overview